Proposed
Amendment to
Centre
County
Long
Range
Transportation Plan (LRTP) 2030
Proposed
Amendment to
2009-2012 Centre
County
Transportation
Improvement Program (TIP)
Amended Air Quality Conformity Analysis Report
Old
Gatesburg Road
Extension Project
The
Centre County Metropolitan Planning Organization (CCMPO) coordinates
transportation planning and programming activities in
Centre
County
. The CCMPO’s LRTP guides
decision making about transportation improvements to the year 2030. The TIP is
a four year financial document that lists the proposed expenditure of federal,
state, and municipal funds for transportation projects.
The
Old Gatesburg Road Extension project in
Ferguson
Township
is proposed to be added to the LRTP and TIP.
A revised air quality conformity analysis has been completed for the
proposed amendments.
The
proposed amendments to the LRTP and TIP, and the amended Conformity Analysis
Report are available for public review during a 30-day period beginning on
Tuesday, August 11, 2009, and concluding at 5:00 pm, Friday, September 11,
2009. The documents are on the web
at www.ccmpo.net and can be
viewed during normal b
us
iness hours at the offices of the Centre Regional Planning Agency and the
Ferguson
Township
Municipal
Building
in State College, the Centre County Planning and Community Development Office
in Bellefonte and the
Philipsburg
Borough
Building
in Philipsburg.
The CCMPO will hold a public meeting to receive input about the proposed
amendments:
Tuesday,
September 8, 2009
Ferguson
Township
Municipal
Building
3147 Research Drive
State College
,
PA
16801
5:00
pm to 6:30 pm
Citizens
are encouraged to provide comments at the meeting or in writing.
The CCMPO Coordinating Committee will consider approval of the
amendments to the LRTP, TIP, and Air Quality Conformity Analysis on Tuesday,
September 22, 2009, 6:00 pm, Ferguson Township Municipal Building, 3147
Research Drive, State College, PA 16801.
For more
information, contact Tom Zilla, Transportation Planner, Centre Regional
Planning Agency, 2643 Gateway Drive, Suite 4, State College, PA 16801;
Phone: 814-231-3050; Fax:
814-231-3083; email: tzilla@crcog.net
. The CCMPO is committed to
compliance with applicable nondiscrimination regulations and policies.
The public meeting location is accessible to persons with disabilities.
If accommodations are needed for those with special needs related to
language, sight or hearing, please call (814) 231-3050 at least five days in
advance.
Background
In
2008, PennDOT initiated the “Pennsylvania Community Transportation Initiative
(PCTI)”, a new program to advance “Smart Transportation” principles in the
Commonwealth. The PCTI is being
funded with a total of $60 million in federal funds from the Pennsylvania
Secretary of Transportation’s discretionary funding allocation in the first
two years of the 2009-2012 State Transportation Improvement Program (STIP)
[Federal Fiscal Year (FFY) 2009 and 2010].
Over
380 applications were received statewide. The
applications were evaluated by the PennDOT Central Office, and the award of
funding to successful projects was announced by the Secretary of Transportation
on May 28, 2009.
One
of two projects approved in
Centre
County
is the Old Gatesburg Road Extension project in
Ferguson
Township
. A total of $2,970,000 in PCTI
funds was approved for the Construction phase of the project, which involves the
construction of a new road between
Science Park Road
and
Blue Course Drive
.
Project
Description
The
Old Gatesburg Road Extension is an integral element of the Pine Hall Traditional
Town Development (TTD), a proposed planned community of approximately 160 acres
located between
Blue Course Drive
and
Science Park Road
. The Pine Hall TTD will result in
infill development within the Regional Growth Boundary (RGB) and Sewer Service
Area (SSA) in the adopted Centre Region Comprehensive Plan, which reduces sprawl
and development pressure on areas outside of the RGB/SSA.
The
Pine Hall TTD Master Plan is being designed within the framework of
Ferguson
Township
’s TTD zoning regulations. The
Master Plan reflects a “new urbanism” theme, including mixed-land use
development in a town center; preservation of key environmental features and
provision of community open space; a range of housing options, including
workforce housing; and a transportation network with provisions for pedestrians,
bicyclists, and public transportation. The
Old Gatesburg Road Extension roadway links transportation and land use in the
Pine Hall TTD by including design features such as a landscaped median that will
be part of the stormwater management system; sidewalks; bike lanes; and a
roundabout. The roadway will be
designed for a desired operating speed that balances the need to accommodate
significant vehicular traffic volumes, with the desire for slower speeds that
ensures the safety of pedestrians and bicyclists.
The design of the facility incorporates principles of “smart growth”
and “smart transportation”, such as context sensitive design, multi-modal
connections, and improvements to the quality of life.
Ferguson
Township
will complete the design and
pre-construction phases of the project using 100% local funds.
PCTI funds will be used for the Construction phase.
The pre-construction phases, including environmental clearance, must be
expedited to ensure that the PCTI funds can be obligated by the September 2010
deadline specified in the PCTI program guidelines.
For
PCTI funds to be expended on the Construction phase, the project must be
included on the Centre County Metropolitan Planning Organization (CCMPO) Long
Range Transportation Plan (LRTP) 2030, and the CCMPO’s 2009-2012
Transportation Improvement Program (TIP). Because
the Old Gatesburg Road Extension will provide new lane capacity to the roadway
network, an amended Air Quality Conformity Analysis is required to be completed
and approved prior to the project being added to the LRTP and TIP.
Proposed
Actions
In
order for the project to be eligible for PCTI funds, the CCMPO must take the
following actions:
 |
Approve
an amended Air Quality Conformity Analysis for the CCMPO’s LRTP 2030 and
2009-2012 TIP that includes the Old Gatesburg Road Extension project.
|
 |
Add
the Old Gatesburg Road Extension project to the CCMPO LRTP 2030 in the
2009-2010 time period ($2,970,000).
|
 |
Add
the Old Gatesburg Road Extension project to the CCMPO’s 2009-2012 Centre
County TIP in Federal Fiscal Year 2010 ($2,970,000). |
*****
Review
and Approval Process
The
proposed actions are being advertised for a 30-day public comment period.
A public meeting to solicit input will be held on Tuesday, September 8,
2009.
On
Wednesday, September 9, 2009, the CCMPO Technical Committee will review the
actions and consider providing a recommendation to the CCMPO Coordinating
Committee. The Technical Committee
will meet at 9:30 am at the
Patton
Township
Municipal
Building
, 100 Patton Plaza,
State College
,
PA
16803
.
On
Tuesday, September 22, 2009, the CCMPO Coordinating Committee will consider
taking action on the three items. The
Coordinating Committee will meet at 6:00 pm at the
Ferguson
Township
Municipal
Building
,
3147 Research Drive
,
State College
,
PA
16801
.
|
PROJECT
SUMMARY
|
|
Description
of
Proposed Project
|
Old
Gatesburg Road
Extension
|
Construct
new two-lane road with turning lanes and one roundabout on new
alignment between Local Federal Aid Route S006 (Science Park Road) and S012 (Blue Course Drive).
The
project will accommodate pedestrians, bicyclists, and public
transportation, and will be designed in close coordination with the
Pine Hall Traditional Town Development (TTD) Master Plan.
|
|
Municipality
|
Ferguson
Township
|
|
Proposed
LRTP Time Period
|
2009-2010
|
|
Proposed
TIP Year
|
Federal
Fiscal Year (FFY) 2010
|
|
Proposed
LRTP/TIP Cost
|
$2,970,000
(Construction phase only)
Because
the PCTI funding is discretionary funding allocated specifically to
this project, fiscal constraint will be maintained for the LRTP and
TIP.
|
|
Existing
Conditions
|
Roadway
does not exist. The
proposed alignment crosses lands in agriculture, forest, or
undeveloped use. The
proposed roadway is illustrated on Ferguson
Township’s adopted Official Map.
|
|
Scope
of Improvements
|
Construct
a new two-lane road on new alignment between Science Park Road
and Blue Course Drive. The existing traffic
signal at the intersection of Old Gatesburg Road
and Science Park Road
will be modified. A new
traffic signal will be installed at the intersection of Old
Gatesburg Road Extension and Blue Course Drive.
One
roundabout will be located at the intersection with Pine Hall Road
, and turning lanes will be provided at intersections with other
streets in the proposed Pine Hall TTD.
Sidewalks,
crosswalks and bicycle lanes will be provided, and accommodations
will be made to facilitate public transportation.
|
|
Schedule
|
Ferguson
Township
will complete
the pre-construction phases of work using 100% local funding.
Preliminary Engineering and environmental clearance
activities were initiated in July 2009.
Preliminary
Engineering:
2009
Final
Design/Right-of-Way:
2010
Construction:
2011
|
Area
Map
Project
Location Map
Project
Detail Map
|